As we begin to describe the things occurring with our process through a Process Map we begin to see some steps that are NVA which stands for ____________.
One of the primary deliverables from performing a SIPOC is to begin to understand which inputs have the greatest affect on the ____________ most valued outputs.
SIPOC stands for Suppliers, Inputs, ___________ , Output and Customers.
A Micro Process Map may map a process showing the entire activities of a department and can likely be broken into many Macro Process Maps showing numerous processes that comprise the activities of the department.
Process Capability is defined based on customer requirements, defect free performance and output over time.
The Control Plan is the road map to sustaining the improvements made through the Lean Six Sigma project and should therefore involve keeping the __________ up to date as a means of supporting the Response Plan in case a defect is noticed.
To minimize waste through the application of Lean Principles we do which of the following?
A Lean Principle that states the process of eliminating waste is a continual process requiring one to always be on the lookout for ways to reduce the seven elements of waste is known as ____________ .
An important factor in a viable _________ is to determine who, when and to what level various personnel must be trained to maintain the improvements made to a process.
A Monitoring Plan put into place at the conclusion of a project will provide for adequate systems with key metric readouts indicating out-of-spec conditions.
Question