SIMULATION

You are a functional consultant for Contoso Entertainment System USA (USMF).

You need to assign a cost of 1,000 US dollars to the night shift.

To complete this task, sign in to Dynamics 365 portal. You must complete Task 1 before completing this task. Task 1 is the creation of a new cost category named NightShift for the night shift.

A.

Explanation

A.

Explanation

Answers
Suggested answer: A

Explanation:


You need to configure a cost group with the type set to 'Direct Manufacturing'. This cost group can then be associated to the Nightshift cost category.

1. Navigate to Production control > Setup > Routes > Cost groups

2. Click the +New button to add a new cost group.

3. Give the cost group a name such as Nightshift.

4. Configure the cost group type to be Direct Manufacturing.

5. Configure the behavior to Fixed.

6. Go to the NightShift cost category.

7. Enter 1000 in the Cost Price field.

8. Select the Nightshift cost group in the Cost Group field.

9. Click Close to close the window.

DRAG DROP

You are the production supervisor at a manufacturing company. You are in the process of configuring the production control module and its parameters.

A company plans to use manufacturing execution. Bill of materials (BOM) item consumption must be generated when items are reported at the operation level.

You need to configure the Manufacturing execution production order defaults form to allow for back flushing on operations.

How should you set up Automatic BOM consumption? To answer, drag the appropriate setting to the correct targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.


Question 102
Correct answer: Question 102

Explanation:


References:

https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/production-parameters-manufacturing-execution

DRAG DROP

A skateboard manufacturer uses route operations to schedule resources and estimate units per hour. All products use the sample sub assembly item and resource sanding process.

You observe an increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce.

You must make a permanent change to the number of units the resource can produce for all future orders.

You need to adjust the process quantity on the route operation.

Which three actions should you perform in sequence? To answer, move the appropriate actions form the list of actions to the answer area and arrange them in the correct order.


Question 103
Correct answer: Question 103

HOTSPOT

A company implements Dynamics 365 for Finance and Operations. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.

You need to set up the system.

Which behaviors should you expect? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.


Question 104
Correct answer: Question 104

DRAG DROP

A pharmaceutical manufacturer uses Process manufacturing.

You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.

You need to change the coverage group of the items.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.


Question 105
Correct answer: Question 105

HOTSPOT

You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.

You need to set up a new item for the car audio system.

How should you create the new product? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.


Question 106
Correct answer: Question 106

DRAG DROP

A company manufactures high-end speakers. Customers may choose different color finishes and front grills. You build a product configuration model to represent this speaker.

You add the following attributes for the finish and grill.

You need to create a constraint that defines the allowable finish and grill combinations.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions and arrange them in the correct order.


Question 107
Correct answer: Question 107

DRAG DROP

A configure-to-order company is implementing Dynamics 365 for Finance and Operations. The company is preparing to use the product configuration model functionality to develop the Bill of materials (BOM), routes and valid configuration combinations.

You need to set up the configuration models, constraints, and pricing.

In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.


Question 108
Correct answer: Question 108

HOTSPOT

A company manufactures high-end speaker systems. You have different configurations available for customers to customize features including finishes and speaker materials. You have a product configuration model with bill of material lines and conditions for each component.

A customer can optionally add on protective covers, but only if a non-metal material is selected. If any other material is selected, the covers cannot be added. You add the following attributes:

You need to create an expression-based constraint that will only allow Corner Protection if Metal is not selected.

How should you complete the expression? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.


Question 109
Correct answer: Question 109

DRAG DROP

A manufacturer uses route operations and job scheduling.

You use a unique calendar for a conveyor line. The company observes a decrease in the number of hours a conveyor line resource is operational due to breakdowns. You must make a temporary change to the number of hours the resource is available.

You need to adjust the efficiency percentage for the conveyor line calendar.

Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.


Question 110
Correct answer: Question 110
Total 203 questions