A manufacturing company is implementing Dynamics 365 Supply Chain Management. The company uses a standard costing model to value inventory.
During the setup of the system, all areas that impact the standard cost of the item must be configured correctly to calculate a complete standard cost by using routing, Bill of materials (BOM) and overhead burden.
You need to verify that all areas of the system are correctly configured.
Which object does NOT impact the standard cost of manufactured items?
item group
cost groups
cost categories
BOM formula
A company is looking to use Dynamics 365 Supply Chain Management.
The company is in the process of redesigning and retooling an existing manufacturing plant to group similar, cellular operations to improve efficiency and minimize wasted time between operations. They want to locate raw materials close to where they are needed without losing reorder visibility.
You need to set up their environment.
Which kind of production type should you implement?
Lean manufacturing
Process manufacturing
Discrete manufacturing
Manufacturing execution
A company is looking to use Dynamics 365 Supply Chain Management.
The company is in the process of redesigning and retooling an existing manufacturing plant to support a large long-running contract. They want to be able to forecast capacity to easily ramp up for additional products.
You need to set up the environment.
Which type of manufacturing should you implement?
Lean
Discrete
Job shop
Process
A company produces generic and name-brand paper plates in the same factory using standard costing and using the same Bill of materials and routes to produce both products.
The finance and production teams want a way to view individual raw material consumption costs in the ledger.
You need to add a production group to control postings to the ledger.
What should you do?
Create a production group for the finished good item
Update the cost of the generic finished good item
Create a production pool for the finished good item
Create a new Bill of materials with alternate costs for the raw material
A manufacturing company uses advanced warehouse management functionality for a new warehouse.
After releasing a production order, you observe that the warehouse work for raw material picking was not generated.
You need to go through the warehouse management setup to determine what is missing.
What three setup configurations must you validate? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
Work template for raw material picking
Wave template
Directive codes
Confirm the production output location on your resource group
Location directive for raw material picking
A company makes lubricants and greases used in the automotive industry.
They are planning to use Dynamics 365 Supply Chain Management to make products whose characteristics can be tracked throughout the production process and are associated with the packaged product.
You need to identify which production methodology to use.
Which production methodology should you use?
Discrete manufacturing
Lean manufacturing
Process manufacturing
Job shop manufacturing
A company produces multiple products that require an installation kit that includes 50 components.
The company does not want to include these 50 components in every Bill of materials (BOM). You have a BOM kit that includes all 50 components, but you do not want it to produce a separate production order.
You need to set up the product BOM for the finished good.
What should you do?
Select Phantom on the engineering fast tab on the kit item
Change the coverage group on the kit item to Manual
Change the line type to Phantom
Change the line type to Pegged supply
You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company.
It is the end of the year and the labor rates have been recalculated based on new salary data.
You need to update the effective labor costs for all labor groups.
Which element must be updated?
cost groups
shared category
resource group
cost category
production orders
A company produces pipe at certain fixed lengths.
The company must be able to schedule cutting machines. You set up the cutting machines as resources. All cutting resources can produce many of the products. There are some products that require cutting machines that can produce longer lengths of product. Only some of the machines can do this.
You need to configure the resources to account for these different products.
What should you do?
Configure the Data/Hour option on the Capacity unit field on the resource.
Build capability related to length and assign to the appropriate resources.
Create a resource group for each length.
Create a resource for each length.
A company manufactures and sells speaker boxes. The speaker boxes can be silver or black with a basic or upgraded wiring harness assembly.
The speaker box must be created in the item master so the variables for colors and harness type can be assigned at order entry.
You need to create a new item that supports multiple variables.
What should you do?
Create a new product. Select predefined variant as the configuration technology
Create a new product. Select constraint-based configuration as the configuration technology
Create a new product master. Select predefined variant as the configuration technology
Create a new product master. Select constraint-based configuration as the configuration technology
Question