Microsoft MB-320 Practice Test - Questions Answers, Page 7
List of questions
Question 61

SIMULATION
You are a functional consultant for Contoso Entertainment System USA (USMF).
You need to configure the system to ensure that production purchases are grouped by purchase agreement.
To complete this task, sign in to Dynamics 365 portal.
Explanation
Explanation:
1. Navigate to the Master Planning Parameters form (Master Planning > Setup > Master Planning Parameters).
2. Select the Standard Update tab.
3. Select the Group by purchase agreement option. This option will also automatically select the Find purchase agreements option.
4. Save the changes.
Reference: https://docs.microsoft.com/en-us/learn/modules/configure-use-master-planning-dyn365-supply-chain-mgmt/03-parameters
Question 62

SIMULATION
You are a functional consultant for Contoso Entertainment System USA (USMF).
You need to configure the system to ensure that planned master orders generated by Material Requirements Planning (MRP) contain trade agreements.
To complete this task, sign in to Dynamics 365 portal.
Explanation
Explanation:
1. Navigate to the Master Planning Parameters form (Master Planning > Setup > Master Planning Parameters).
2. Select the Planned Orders tab.
3. Select the Find Trade Agreements option.
4. Save the changes.
Reference: https://docs.microsoft.com/en-us/learn/modules/configure-use-master-planning-dyn365-supply-chain-mgmt/03-parameters
Question 63

SIMULATION
You are a functional consultant for Contoso Entertainment System USA (USMF).
You need to schedule the Material Requirements Planning (MRP) master plan to run nightly at 03:00 (UTC-8).
To complete this task, sign in to Dynamics 365 portal.
Explanation:
Explanation:
You need to configure a batch job to run the master plan nightly.
Create the batch job
1. Go to Navigation pane > Modules > System administration > Inquiries > Batch jobs.
2. Click New.
3. In the Job description field, type a value.
4. In the Scheduled start date/time field, enter a date and time.
5. Click Save.
Create a recurrence
1. On the Action Pane, click Batch job.
2. Click Recurrence. Use these options to enter a range and pattern for the recurrence.
3. Click OK.
Reference: https://docs.microsoft.com/en-us/dynamics365/fin-ops-core/dev-itpro/sysadmin/tasks/create-batch-job
Question 64

HOTSPOT
A company implements Dynamics 365 for Finance and Operations.
You run a master plan each week.
You need to resolve the issue in the scenario.
What should you do? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/job-scheduling
Question 65

DRAG DROP
You are the quality assurance manager of a pharmaceuticals company.
One of your customers has requested to only receive batches of item B0001 that have an acid concentration between 5.5% - 10.5%.
You need to set up the customer specific batch attribute to track percent acid for B0001.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in correct order.
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/batch-attributes
Question 66

DRAG DROP
You are the product manager at a distribution company. You are responsible for managing product compliance standards and reporting.
Chemical product, C0001 can be sold in all parts of the United States except for the state of California.
You need to set up these compliance requirements for C0001.
Which four actions should be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012//restricted-products-item-by-country-or-state-form?redirectedfrom=MSDN
Question 67

HOTSPOT
A company produces lotions for pain relief and uses Dynamics 365 for Finance and Operations.
You have been provided the following information for a new relieving lotion.
Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.
Question 68

DRAG DROP
You are the product manager at a paint manufacturing company. Paint base is produced in 100 gallon batches. The paint base can be packaged in 1 gallon, 5 gallon, and 10 gallon containers.
You want to use consolidated batch orders for the bulk paint base item. You need to set up the items and formulas to allow for consolidated batch orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Question 69

DRAG DROP
A company implements Dynamic 365 for Finance and Operations. You run the latest master plan. You observe invalid results.
You need to set up tracing for the master plan.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
Question 70

HOTSPOT
You are a manufacturing consultant helping a client test out different bill of material (BOM) and route consumption options when starting production orders. Material and labor consumption are to be completed before Report as finish.
You are running a production order with BOM lines that have a Flushing principle set to Start. The Automatic Route Consumption Runtime has been set to Yes.
You have set up the default Start user options for all production orders as shown in the exhibit below.
Question