ExamGecko
Home Home / Nutanix / NCS-Core

Nutanix NCS-Core Practice Test - Questions Answers, Page 17

Question list
Search
Search

List of questions

Search

Related questions











While preparing for a new four-node cluster installation, the consultant has a Tech Review Call with the customer. The hardware is as follows:

* 4 nodes in 1 Block

* 8 x 10 GbE Ports

* 4 x 1 GbE IPMI Ports

* Adequate Ethernet ports are available

* Ethernet cables are correct and available

* Adequate rack space is available

Which remaining item must be confirmed as available onsite?

A.
Crash Cart
A.
Crash Cart
Answers
B.
Fibre Channel switches
B.
Fibre Channel switches
Answers
C.
Redundant 208v power
C.
Redundant 208v power
Answers
D.
Redundant 110v power
D.
Redundant 110v power
Answers
Suggested answer: C

Explanation:

In the preparation for a new cluster installation, after ensuring that the basic physical requirements such as space, cabling, and hardware connectivity are met, it's crucial to confirm power requirements. For enterprise installations, particularly where high-powered equipment like a four-node cluster is involved, ensuring redundant power is critical. The question specifically mentions 'redundant' power, suggesting the need for a high-capacity solution typically found in 208v configurations in data centers, which provides more power efficiently and is standard for high-density computing hardware. Therefore, redundant 208v power should be confirmed as available onsite to support the new cluster's power needs effectively.

Reference: Nutanix Certified Services - Core (NCS-Core) training materials and installation best practices available through Nutanix University and the Nutanix Bible.

After a consultant runs Foundation, the imaging process fails.

In which two locations can the consultant find the logs? (Choose two.)

A.
On the Hypervisor - /home/nutanix/foundation/logs
A.
On the Hypervisor - /home/nutanix/foundation/logs
Answers
B.
Logs link on the Foundation Imaging Screen
B.
Logs link on the Foundation Imaging Screen
Answers
C.
On the Foundation VM - /home/nutanix/foundation/logs
C.
On the Foundation VM - /home/nutanix/foundation/logs
Answers
D.
On the CVM - /home/Nutanix/foundation/logs
D.
On the CVM - /home/Nutanix/foundation/logs
Answers
Suggested answer: B, C

Explanation:

When encountering issues during the Foundation process, such as an imaging failure, consultants need to access detailed logs to diagnose the problem. Two primary locations for these logs include the direct link accessible via the Foundation Imaging Screen, which provides real-time logs during the imaging process, and the Foundation VM directory at /home/nutanix/foundation/logs. These locations offer comprehensive log data essential for troubleshooting and resolving imaging issues.

Reference: Nutanix Foundation documentation and troubleshooting guides from the Nutanix Bible and Nutanix University training resources.

During a technical call with a customer, it is identified that this installation will be software only on Dell servers. The out-of-band management interfaces will not be given IP addresses until the consultant is onsite.

Which Foundation method should be used for this type of installation?

A.
Bare metal using iDRAC MAC addresses.
A.
Bare metal using iDRAC MAC addresses.
Answers
B.
Bare metal using LAN MAC addresses.
B.
Bare metal using LAN MAC addresses.
Answers
C.
Bare metal using block serial numbers.
C.
Bare metal using block serial numbers.
Answers
D.
Bare metal using node serial numbers.
D.
Bare metal using node serial numbers.
Answers
Suggested answer: A

Explanation:

In scenarios where a software-only installation is planned on Dell servers without pre-configured IP addresses for out-of-band management interfaces, the iDRAC MAC addresses are crucial. Using iDRAC (Integrated Dell Remote Access Controller), a consultant can perform a bare metal installation remotely and manage the servers effectively. This method is preferable when IP addresses are not initially available, allowing the consultant to utilize the out-of-band management network for setup.

Reference: Nutanix Installation and Configuration guides, especially those pertaining to Dell hardware, available through the Nutanix Bible and official Nutanix training materials.

A consultant is using the Foundation applet to create a cluster. During the process the consultant refreshes the progress bar web page and is concerned when nothing loads.

What should the consultant do to verify that Foundation has completed successfully?

A.
Return to the Foundation configuration page and start over.
A.
Return to the Foundation configuration page and start over.
Answers
B.
Update Java on the Foundation VM.
B.
Update Java on the Foundation VM.
Answers
C.
Connect to any CVM IP address from a web browser.
C.
Connect to any CVM IP address from a web browser.
Answers
D.
Restart the Foundation process.
D.
Restart the Foundation process.
Answers
Suggested answer: C

Explanation:

If the Foundation applet's progress bar webpage does not load after a refresh during a cluster creation, the consultant should verify if the Foundation process has completed by attempting to connect to any CVM (Controller Virtual Machine) IP address using a web browser. Accessing the CVM will confirm whether the nodes are operational and part of the cluster, thus indicating whether the Foundation process has successfully completed or not.

Reference: Nutanix Bible, NCS-Core 6.8 official documentation on the Foundation process.

A consultant is setting up a new Hyper-V cluster. The customer requirements are as follows:

* VMs should automatically failover to another host if the host crashes

* Host CPU and Memory resources should be evenly balanced

* New VMs should be placed on the host with the most resources available

Which two Hyper-V features can be used to meet the requirements? (Choose two.)

A.
Performance Resource Optimization
A.
Performance Resource Optimization
Answers
B.
Failover Clustering
B.
Failover Clustering
Answers
C.
High Availability
C.
High Availability
Answers
D.
Distributed Resource Scheduler
D.
Distributed Resource Scheduler
Answers
Suggested answer: B, C

Explanation:

The customer's requirements for automatic failover and resource balancing in a new Hyper-V cluster can be met with the use of Failover Clustering and High Availability. Failover Clustering allows VMs to automatically failover to another host in the event of a host failure, fulfilling the requirement for resilience. High Availability ensures that VMs restart on available hardware in the cluster, maintaining service continuity and balancing CPU and memory resources across the hosts.

Reference: Microsoft Hyper-V documentation, Nutanix Bible, and NCS-Core 6.8 course materials on virtualization platforms.

A consultant creates an AHV cluster and connects the Intel X550T NICs to the top of rack switch using Twinax cables. The activity and link lights are green. The cluster cannot communicate over the 10GbE link.

What is the first command the consultant should perform to troubleshoot the issue?

A.
manage_ovs show_bridges
A.
manage_ovs show_bridges
Answers
B.
manage_ovs show_interfaces
B.
manage_ovs show_interfaces
Answers
C.
manage_ovs update_uplinks
C.
manage_ovs update_uplinks
Answers
D.
manage_ovs show_uplinks
D.
manage_ovs show_uplinks
Answers
Suggested answer: B

Explanation:

When facing issues with network communication over 10GbE links, the first command to troubleshoot is manage_ovs show_interfaces. This command allows the consultant to review the operational status and settings of each network interface, including those connected via Twinax cables to the top of rack switch. This will show whether the interfaces are correctly configured and functioning, which is essential for establishing a successful network link.

Nutanix Command Reference Guide: https://portal.nutanix.com

Nutanix Community Network Troubleshooting Tips: Nutanix Community

A customer has a G6 AHV cluster with 4x10GbE NICs on each node and the following configuration:

* Networking is set to default

* Only two NICs are connected

The customer receives the following critical message:

The NIC is disconnected from the switch, or the switchport is failing.

What should the consultant verify to resolve the issue?

A.
The NICs are configured for active-backup.
A.
The NICs are configured for active-backup.
Answers
B.
The VLANs are configured correctly on the switch or tagged on the cluster.
B.
The VLANs are configured correctly on the switch or tagged on the cluster.
Answers
C.
The other two 10GbE connections are removed from the default bond.
C.
The other two 10GbE connections are removed from the default bond.
Answers
D.
The NICs are connected for balance-slb.
D.
The NICs are connected for balance-slb.
Answers
Suggested answer: A

Explanation:

Given the critical message about the NIC being disconnected or the switchport failing, the consultant should first verify the bonding mode of the NICs, especially since only two out of four 10GbE NICs are connected. In an AHV cluster, the NICs can be configured in different bonding modes such as active-active or active-backup. Ensuring that the NICs are configured for active-backup can provide redundancy by allowing one NIC to take over if the other fails, which seems to be necessary given the critical error indicating a possible disconnection or switchport failure.

Reference: Nutanix Bible (https://www.nutanixbible.com/), Nutanix University (https://university.nutanix.com/)

A consultant deploys a four-node VMware ESXi cluster and vCenter server. An HA/DRS cluster is configured for all four nodes. The customer deploys five new VMs on the cluster.

During the knowledge Transfer, a network cable on one node is removed to demonstrate HA and migration of the VMs to another host. In the HA/DRS cluster settings, the VM Restart Priority for all CVMs is set to Disabled. The customer observes warnings that the CVM on the ejected host is no longer powered on.

Which ESXi HA/DRS cluster setting is missing?

A.
Enable EVC for the cluster.
A.
Enable EVC for the cluster.
Answers
B.
Disable VM Monitoring on all CVMs.
B.
Disable VM Monitoring on all CVMs.
Answers
C.
Disable Automation Level on all CVMs.
C.
Disable Automation Level on all CVMs.
Answers
D.
Enable Host Monitoring.
D.
Enable Host Monitoring.
Answers
Suggested answer: D

Explanation:

The issue indicated is that the VMs, specifically the CVMs (Controller VMs), do not restart on the remaining nodes after a network cable is removed, demonstrating a failure of HA (High Availability). The setting that should be verified is 'Host Monitoring' within the ESXi HA/DRS settings. This setting enables the host to monitor the state of other hosts in the cluster and take necessary actions like VM restarts on other hosts in the event of failures. If it's disabled, the cluster wouldn't automatically manage the failover of VMs upon host disconnection.

Reference: Nutanix Bible (https://www.nutanixbible.com/), Nutanix Official YouTube Training Series

Refer to the exhibit.

A consultant is deploying a cluster using the customer-provided IP addressing information.

Which option in Foundation must be configured to ensure connectivity during the deployment?

A.
Link Aggregation
A.
Link Aggregation
Answers
B.
Range Autofill
B.
Range Autofill
Answers
C.
Network Segmentation
C.
Network Segmentation
Answers
D.
Multi-homing
D.
Multi-homing
Answers
Suggested answer: B

Explanation:

During the deployment of a cluster using the Nutanix Foundation, ensuring all IP ranges are correctly configured is crucial for successful connectivity and deployment. 'Range Autofill' is a feature in Foundation that automatically populates IP address fields based on the first IP provided, ensuring consistency and correctness across multiple nodes being deployed simultaneously. This feature helps avoid manual entry errors and ensures all nodes are configured with appropriate IP addresses that fall within the specified range.

Reference: Nutanix University (https://university.nutanix.com/)

After imaging the nodes and creating the cluster successfully, the consultant connects the cluster to the customer network. When logging into Prism, the events dashboard is full of errors.

What is causing the issue?

A.
The cluster was not stopped prior to connecting to the customer network.
A.
The cluster was not stopped prior to connecting to the customer network.
Answers
B.
The Cluster Virtual IP Address (VIP) was not set up during the process.
B.
The Cluster Virtual IP Address (VIP) was not set up during the process.
Answers
C.
Foundation did not create the cluster successfully.
C.
Foundation did not create the cluster successfully.
Answers
D.
The consultant did not run Nutanix Cluster Check (NCC)
D.
The consultant did not run Nutanix Cluster Check (NCC)
Answers
Suggested answer: B

Explanation:

After creating a cluster and connecting it to the customer's network, if the events dashboard in Prism is full of errors, a likely cause could be that the Cluster Virtual IP Address (VIP) was not properly set up. The VIP is crucial for accessing the Nutanix Prism interface and for the proper functioning of the cluster's management operations.

Total 302 questions
Go to page: of 31