Nutanix NCS-Core Practice Test - Questions Answers, Page 17
List of questions
Related questions
While preparing for a new four-node cluster installation, the consultant has a Tech Review Call with the customer. The hardware is as follows:
* 4 nodes in 1 Block
* 8 x 10 GbE Ports
* 4 x 1 GbE IPMI Ports
* Adequate Ethernet ports are available
* Ethernet cables are correct and available
* Adequate rack space is available
Which remaining item must be confirmed as available onsite?
After a consultant runs Foundation, the imaging process fails.
In which two locations can the consultant find the logs? (Choose two.)
During a technical call with a customer, it is identified that this installation will be software only on Dell servers. The out-of-band management interfaces will not be given IP addresses until the consultant is onsite.
Which Foundation method should be used for this type of installation?
A consultant is using the Foundation applet to create a cluster. During the process the consultant refreshes the progress bar web page and is concerned when nothing loads.
What should the consultant do to verify that Foundation has completed successfully?
A consultant is setting up a new Hyper-V cluster. The customer requirements are as follows:
* VMs should automatically failover to another host if the host crashes
* Host CPU and Memory resources should be evenly balanced
* New VMs should be placed on the host with the most resources available
Which two Hyper-V features can be used to meet the requirements? (Choose two.)
A consultant creates an AHV cluster and connects the Intel X550T NICs to the top of rack switch using Twinax cables. The activity and link lights are green. The cluster cannot communicate over the 10GbE link.
What is the first command the consultant should perform to troubleshoot the issue?
A customer has a G6 AHV cluster with 4x10GbE NICs on each node and the following configuration:
* Networking is set to default
* Only two NICs are connected
The customer receives the following critical message:
The NIC is disconnected from the switch, or the switchport is failing.
What should the consultant verify to resolve the issue?
A consultant deploys a four-node VMware ESXi cluster and vCenter server. An HA/DRS cluster is configured for all four nodes. The customer deploys five new VMs on the cluster.
During the knowledge Transfer, a network cable on one node is removed to demonstrate HA and migration of the VMs to another host. In the HA/DRS cluster settings, the VM Restart Priority for all CVMs is set to Disabled. The customer observes warnings that the CVM on the ejected host is no longer powered on.
Which ESXi HA/DRS cluster setting is missing?
Refer to the exhibit.
A consultant is deploying a cluster using the customer-provided IP addressing information.
Which option in Foundation must be configured to ensure connectivity during the deployment?
After imaging the nodes and creating the cluster successfully, the consultant connects the cluster to the customer network. When logging into Prism, the events dashboard is full of errors.
What is causing the issue?
Question