A consultant is preparing to add new nodes into an existing cluster. The current cluster AOS version is 5.8. The new expansion node is currently running AOS 5.9 code. The cluster must continue to run at its current AOS version.

Which method can be used to successfully add the node?

A.
Upgrade the cluster to 5.9 and add the node through Prism Element.
A.
Upgrade the cluster to 5.9 and add the node through Prism Element.
Answers
B.
Use Prism Element to Expand the cluster and select the re-image option.
B.
Use Prism Element to Expand the cluster and select the re-image option.
Answers
C.
Use the CLI and enter cluster add-node node-serial=''node_serial''.
C.
Use the CLI and enter cluster add-node node-serial=''node_serial''.
Answers
D.
Use Prism Element, which will downgrade the node by default during the node add process.
D.
Use Prism Element, which will downgrade the node by default during the node add process.
Answers
Suggested answer: B

Explanation:

When adding a new node with a higher AOS version (5.9) into an existing cluster running an older version (5.8), the recommended method is to use Prism Element to expand the cluster and select the re-image option. This process involves re-imaging the new node to the AOS version currently running in the cluster (5.8), ensuring compatibility and stability across the cluster without requiring an overall upgrade to a newer version. This approach maintains the cluster's operational integrity while integrating the new hardware.

Reference: Nutanix Bible, NCS-Core 6.8 official training materials, and Nutanix support documentation on cluster expansion.

While trying to upgrade AOS in a cluster, a consultant receives a warning message that there are two powered-on VMs that need to be powered off for the upgrade to proceed.

What would cause this warning to be issued?

A.
Upgrading a single-node cluster requires the VMs to be shut down.
A.
Upgrading a single-node cluster requires the VMs to be shut down.
Answers
B.
Upgrading a two-node cluster requires the VMs to be shut down.
B.
Upgrading a two-node cluster requires the VMs to be shut down.
Answers
C.
There are not enough resources left in the single-node cluster.
C.
There are not enough resources left in the single-node cluster.
Answers
D.
There are not enough resources left in the two-node cluster.
D.
There are not enough resources left in the two-node cluster.
Answers
Suggested answer: B

Explanation:

The warning message about powering off VMs during an AOS upgrade in a two-node cluster is issued because, in smaller clusters such as two-node configurations, resource availability and redundancy are limited. To safely perform an upgrade without risking service disruption, the VMs need to be powered down to free up resources and ensure that there is sufficient capacity to handle the cluster operations during the upgrade process.

Reference: Nutanix Bible, NCS-Core 6.8 course content, and Nutanix upgrade best practices.

A consultant successfully completes a Foundation using a flat switch. The consultant then works with the customer to move the cluster over to their production network. After the move, the CVMs and hypervisors can no longer communicate, which prevents the cluster from starting.

Which option should be used to resolve this issue?

A.
If the IPMI is in use, check that the IPMI can ping the default gateway over IPv6.
A.
If the IPMI is in use, check that the IPMI can ping the default gateway over IPv6.
Answers
B.
Make sure that the IPMI and CVM VLAN is manually tagged on the Host and CVM.
B.
Make sure that the IPMI and CVM VLAN is manually tagged on the Host and CVM.
Answers
C.
Verify that IPv6 Link Local and DHCP is enabled on all switch ports.
C.
Verify that IPv6 Link Local and DHCP is enabled on all switch ports.
Answers
D.
If using VLANs, confirm the hypervisor/CVM VLAN is set as Native on the switch ports.
D.
If using VLANs, confirm the hypervisor/CVM VLAN is set as Native on the switch ports.
Answers
Suggested answer: D

Explanation:

The inability of CVMs and hypervisors to communicate after moving a cluster to the production network typically points to a VLAN configuration issue. The correct action is to confirm that the VLAN designated for hypervisor/CVM communication is set as the Native VLAN on the switch ports to which the nodes are connected. This setting ensures that traffic from these VLANs is properly prioritized and handled by the network, thereby restoring communication between CVMs and hypervisors and allowing the cluster to start.

Reference: Nutanix Bible, NCS-Core 6.8 official documentation on networking configurations, and troubleshooting VLAN issues.

A customer racks all nodes in the new cluster. The customer does not allow IPv6 for node discovery.

The consultant is not allowed to use the consultant's own flat switch in the customer's environment.

Which step should the consultant take to resolve this issue?

A.
Bare metal image all nodes with Foundation VM.
A.
Bare metal image all nodes with Foundation VM.
Answers
B.
Image each node individually with Foundation VM.
B.
Image each node individually with Foundation VM.
Answers
C.
Connect to the top of rack switch and discover the nodes with IPv4.
C.
Connect to the top of rack switch and discover the nodes with IPv4.
Answers
D.
Open a console to all nodes and statically assign IP addresses.
D.
Open a console to all nodes and statically assign IP addresses.
Answers
Suggested answer: C

Explanation:

In environments where IPv6 is not allowed for node discovery and the use of an external flat switch by the consultant is also restricted, the viable approach is to connect to the top of rack switch and discover the nodes using IPv4. This method aligns with the customer's networking policies and leverages the existing network infrastructure to facilitate the discovery and configuration of the nodes within the Nutanix cluster.

Reference: Nutanix Bible, Nutanix University NCS-Core 6.8 resources, and Nutanix official guidelines on node discovery using IPv4.

A consultant configures a Nutanix cluster and integrates the hosts into vCenter using VMware best practices. The customer has requested that the Nutanix cluster only have a single datastore.

Upon configuring the cluster per the customer requirements, vCenter displays an alert regarding the heartbeat datastore. The consultant adds the das.ignoreInsufficientHbDatastore value = true rule. The container can be seen from each host, but the alert remains active.

What should the consultant do to resolve this issue?

A.
Turn off and then turn back on HA.
A.
Turn off and then turn back on HA.
Answers
B.
Make sure the DRS setting is turned on.
B.
Make sure the DRS setting is turned on.
Answers
C.
Create a second container.
C.
Create a second container.
Answers
D.
Whitelist the vCenter IP address within Prism.
D.
Whitelist the vCenter IP address within Prism.
Answers
Suggested answer: A

Explanation:

The alert regarding the heartbeat datastore in vCenter, despite setting das.ignoreInsufficientHbDatastore to true, suggests that HA has not acknowledged the updated configuration. The effective solution is to restart HA on the cluster, which involves turning off HA and then turning it back on. This reset will allow vCenter to re-evaluate the datastore configuration and recognize that the insufficient heartbeat datastore alert should be suppressed as per the updated setting.

VMware Documentation on HA Configuration: VMware Support

Nutanix and VMware Integration Guide: Nutanix Documentation

After finishing foundation on an AHV cluster, a consultant is preparing to plug into the customer network given the following set of requirements:

* All network traffic on trunks is tagged

* Customer is using LACP

* A native VLAN is not in use

Which set of commands should the consultant use to ensure cluster connectivity on customer equipment?

A.
change_cvm_vlan 0 ovs-vsctl set port br0 tag=0 ovs-vsctl set port br0-up bond_mode=balance-tcp
A.
change_cvm_vlan 0 ovs-vsctl set port br0 tag=0 ovs-vsctl set port br0-up bond_mode=balance-tcp
Answers
B.
change_cvm_vlan 10 ovs-vsctl set port br0 tag=10 ovs-vsctl set port br0-up bond_mode=balance-tcp
B.
change_cvm_vlan 10 ovs-vsctl set port br0 tag=10 ovs-vsctl set port br0-up bond_mode=balance-tcp
Answers
C.
change_cvm_vlan 0 ovs~vsctl set port br0 tag=0 ovs~vsctl set port br0-up bond_mode=active-backup
C.
change_cvm_vlan 0 ovs~vsctl set port br0 tag=0 ovs~vsctl set port br0-up bond_mode=active-backup
Answers
D.
change_cvm_vlan 10 ovs-vsctl set port br0 tag=10 ovs-vsctl set port br0-up bond_mode=balance-slb
D.
change_cvm_vlan 10 ovs-vsctl set port br0 tag=10 ovs-vsctl set port br0-up bond_mode=balance-slb
Answers
Suggested answer: B

Explanation:

Considering the network configuration requirements---where all trunk traffic is tagged and a native VLAN is not used---the consultant must set up the CVM and bridge to operate with a specific VLAN tag. The command change_cvm_vlan 10 configures the Controller VM (CVM) to communicate over VLAN 10. The command ovs-vsctl set port br0 tag=10 applies VLAN 10 tagging to the bridge interface br0, ensuring all traffic through it is appropriately tagged. The command ovs-vsctl set port br0-up bond_mode=balance-tcp sets the bonding mode to balance-tcp, which is suitable for environments using LACP to optimize traffic distribution and redundancy across multiple physical links.

Reference: Nutanix Community Documentation, Nutanix University Networking Best Practices.

After installation, network ports are properly configured with the default active-backup bonding.

One 10GbE port goes to switch 1. Another 10GbE port goes to switch 2. A consultant tests failover by manually pulling one of the cables and notices it is taking too much time to failover, which is causing excessive packet loss.

What should the consultant enable to resolve this issue?

A.
LACP on switch
A.
LACP on switch
Answers
B.
PAgP
B.
PAgP
Answers
C.
Portfast
C.
Portfast
Answers
D.
Jumbo frames
D.
Jumbo frames
Answers
Suggested answer: C

Explanation:

In this scenario, the delay and packet loss during failover when one of the network cables is disconnected can be addressed by enabling 'Portfast' on the switch ports connected to the Nutanix nodes. Portfast is a Cisco network switch feature that allows network switches to immediately bring ports into the forwarding state during connectivity changes, bypassing the usual listening and learning states of Spanning Tree Protocol (STP). This significantly reduces the time to re-establish network connectivity, thereby minimizing the packet loss during such failover events. Enabling Portfast is crucial for endpoints like servers where quick recovery from disconnections is necessary.

Reference: Cisco Networking Academy materials on STP and Portfast, Nutanix Bible.

A consultant creates a new cluster using ESXi as the hypervisor. After creating the cluster, the consultant begins to run Life Cycle Manager (LCM) updates. During the LCM upgrade pre-checks, an error is returned.

Which configuration is causing this issue?

A.
ESXi cluster admission control is disabled.
A.
ESXi cluster admission control is disabled.
Answers
B.
ESXi cluster DRS is enabled.
B.
ESXi cluster DRS is enabled.
Answers
C.
ESXi cluster HA is enabled.
C.
ESXi cluster HA is enabled.
Answers
D.
ESXi cluster admission control is enabled.
D.
ESXi cluster admission control is enabled.
Answers
Suggested answer: D

Explanation:

The error during LCM pre-checks in an ESXi-based Nutanix cluster with HA enabled is most likely due to the ESXi cluster admission control being enabled. Admission control is a feature in VMware ESXi that reserves resources for HA purposes to ensure that sufficient resources are available in the event of host failures. When admission control is enabled, it can interfere with Nutanix LCM operations, which may require resource reallocation or reconfiguration that conflicts with the reserved capacities set by admission control. Disabling admission control during LCM updates would typically resolve this issue.

Reference: VMware documentation on HA and Admission Control, Nutanix LCM documentation.

A customer has engaged a Nutanix consultant to deploy a cluster consisting of two NX-3460-G6 blocks. The consultant arrives at the customer site and fines the following:

* One rack with a total of 5U available

* Two ToR switches with 14 total available ports

* Dual PDUs with six available sockets

What will prevent the consultant from successfully installing the cluster?

A.
Insufficient sockets for power allocation. Rack space may not be continuous.
A.
Insufficient sockets for power allocation. Rack space may not be continuous.
Answers
B.
Insufficient rack space for block installation. Insufficient sockets for power allocation.
B.
Insufficient rack space for block installation. Insufficient sockets for power allocation.
Answers
C.
Insufficient network ports for communication. Insufficient sockets for power allocation.
C.
Insufficient network ports for communication. Insufficient sockets for power allocation.
Answers
D.
Insufficient network ports for communication. Insufficient sockets for power allocation.
D.
Insufficient network ports for communication. Insufficient sockets for power allocation.
Answers
E.
Insufficient network ports for communication. Rack space may not be continuous.
E.
Insufficient network ports for communication. Rack space may not be continuous.
Answers
Suggested answer: B

Explanation:

To determine the correct answer, you must evaluate the requirements for installing a Nutanix NX-3460-G6 block. Each block typically occupies 2U of rack space. Since the customer has two blocks, a total of 4U is required, which fits within the available 5U rack space. Additionally, each block requires two power sockets (one for each node in the block), totaling four sockets. Since there are six available sockets, there is enough power availability. Therefore, the primary constraints are adequately met in terms of rack space and power sockets. The mention of network ports and their sufficiency is not required here, as it isn't the limiting factor based on the details provided.

Nutanix Bible (https://www.nutanixbible.com)

Nutanix University: NCS-Core 6.8 Training (https://university.nutanix.com)

Nutanix Deployment Guide

Nutanix Hardware and Installation Guide

During a six-node cluster deployment, one node fails to image successfully and Foundation is unable to automatically configure the cluster. The consultant decides to manually complete cluster formation with the successful nodes, then expand the cluster with the remaining unconfigured node.

Which command should be used to begin the process?

A.
cluster status
A.
cluster status
Answers
B.
cluster create
B.
cluster create
Answers
C.
cluster start
C.
cluster start
Answers
D.
cluster expand
D.
cluster expand
Answers
Suggested answer: B

Explanation:

When deploying a multi-node Nutanix cluster, if one node fails to image and the Nutanix Foundation tool cannot configure the cluster automatically, the consultant can manually create the cluster with the nodes that were successfully imaged. The correct command to initiate this process is cluster create. This command starts the cluster services and allows for further expansion once the cluster is operational, which would include adding the node that initially failed to image.

Nutanix Bible (https://www.nutanixbible.com), specifically the section on manual cluster creation.

Nutanix University: NCS-Core 6.8 Training (https://university.nutanix.com), videos on manual cluster operations.

Total 302 questions