List of questions
Related questions
Question 12 - C_TS422_2023 discussion
For a production version to be valid consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.
A.
The deletion flag must NOT be set for the bill of material (BOM) or the routing.
B.
The consistency check must be performed.
C.
The assigned routing bill of material (BOM) must be valid in the entire validity period.
D.
The assigned routing bill of material (BOM) must have the same validity period.
E.
The lot size range must be within the lot size range of the assigned routing.
Your answer:
0 comments
Sorted by
Leave a comment first