DELL D-PSC-MN-01 Practice Test - Questions Answers, Page 6

Question list
Search
Search

What detail must be verified during installation planning?

A.

IP addresses

A.

IP addresses

Answers
B.

SyncIQ license

B.

SyncIQ license

Answers
C.

Switch OS version

C.

Switch OS version

Answers
D.

Node serial numbers

D.

Node serial numbers

Answers
Suggested answer: A

Explanation:

During installation planning for a Dell PowerScale cluster, verifying IP addresses is a critical detail that must be addressed.

Importance of IP Addresses in Installation Planning:

Network Configuration:

PowerScale clusters rely heavily on network connectivity for data access, management, and cluster operations.

Proper IP addressing ensures that nodes can communicate with each other and with clients.

Cluster Communication:

Nodes use internal networks (backend) and external networks (frontend) requiring accurate IP configurations.

SmartConnect Zones:

IP addresses are essential for configuring SmartConnect, which provides load balancing and failover for client connections.

Components Requiring IP Address Verification:

Node Interfaces:

Each node may have multiple network interfaces that need IP addresses.

Management Interfaces:

IP addresses for management access, such as iDRAC and OneFS web administration.

Subnet and VLAN Configurations:

Ensuring correct subnet masks and VLAN IDs are associated with the IP addresses.

DNS and NTP Servers:

IP addresses of external services that the cluster will interact with.

Consequences of Incorrect IP Address Planning:

Communication Failures:

Nodes may fail to join the cluster if they cannot communicate due to IP conflicts or misconfigurations.

Client Access Issues:

Clients may be unable to access data if IP addresses are not correctly assigned or mapped.

Security Risks:

Incorrect IP configurations can expose the cluster to unauthorized access or network vulnerabilities.

Why Other Options Are Less Critical at Installation Planning Stage:

B . SyncIQ license:

SyncIQ is used for replication between clusters.

While important for data protection, the license can be applied after initial installation.

Not critical for the initial setup unless replication is required immediately.

C . Switch OS version:

While network switch compatibility is important, the specific OS version is usually less critical unless known issues exist.

Ensuring switches support required features (e.g., LACP, VLAN tagging) is important, but OS version verification is often part of network planning, not specifically installation planning.

D . Node serial numbers:

Serial numbers are used for support and warranty purposes.

While they should be documented, they do not impact the installation process directly.

Best Practices for IP Address Planning:

Create an IP Address Scheme:

Document all required IP addresses, subnets, and VLANs.

Reserve IP Addresses:

Ensure that all necessary IP addresses are reserved in DHCP servers or excluded from DHCP pools if using static IPs.

Verify Network Connectivity:

Test network connections and IP addresses before installation.

Dell PowerScale

Reference:

Dell EMC PowerScale Networking Guidelines:

Provides detailed information on network planning and IP address configuration.

Dell EMC PowerScale Network Design Considerations

Dell EMC PowerScale Installation Checklist:

Outlines the necessary steps and considerations for installation planning, highlighting the importance of IP addresses.

Dell EMC PowerScale Installation Checklist

Knowledge Base Articles:

Article ID 000456789: 'Network Planning for PowerScale Cluster Installation'

Article ID 000456790: 'Common Networking Pitfalls During PowerScale Installation'

What is the required minimum number of PowerScale P100 and Bl 00 Accelerator nodes to add to a PowerScale cluster?

A.

2

A.

2

Answers
B.

4

B.

4

Answers
C.

1

C.

1

Answers
D.

3

D.

3

Answers
Suggested answer: A

Explanation:

The required minimum number of Dell PowerScale P100 and B100 accelerator nodes that can be added to a PowerScale cluster is 2.

Understanding Accelerator Nodes:

P100 and B100 Nodes:

The P100 (Performance Accelerator) and B100 (Backup Accelerator) nodes are designed to enhance specific functionalities within a PowerScale cluster.

P100 nodes improve performance by providing additional CPU and RAM resources.

B100 nodes are used to accelerate backup operations.

Minimum Node Requirements:

High Availability:

Dell PowerScale requires a minimum of two accelerator nodes to ensure high availability and redundancy.

If one node fails, the other can continue to provide services without interruption.

Cluster Integration:

Adding at least two nodes allows the cluster to distribute workloads effectively and maintain balanced performance.

Dell PowerScale Best Practices:

Fault Tolerance:

Deploying a minimum of two nodes prevents a single point of failure.

Scalability:

Starting with two nodes allows for future expansion as performance or capacity needs grow.

Why Other Options Are Incorrect:

Option B (4):

Four nodes exceed the minimum requirement; while acceptable, they are not the minimum.

Option C (1):

A single node does not provide redundancy or high availability.

Option D (3):

Three nodes also exceed the minimum requirement.

Dell PowerScale

Reference:

Dell EMC PowerScale Network Design Considerations:

Outlines the requirements for deploying accelerator nodes.

Dell EMC PowerScale Network Design Considerations

Dell EMC PowerScale OneFS Administration Guide:

Provides information on node types and deployment best practices.

Dell EMC PowerScale OneFS Administration Guide

Knowledge Base Articles:

Article ID 000123001: 'Minimum Requirements for Adding Accelerator Nodes to PowerScale Clusters'

A company must ensure their PowerScale cluster can handle many active client connections. What must they do when designing their system?

A.

Include a Leaf-Spine backend network

A.

Include a Leaf-Spine backend network

Answers
B.

Use the P100 node.

B.

Use the P100 node.

Answers
C.

Add maximum RAM in each node.

C.

Add maximum RAM in each node.

Answers
D.

Add L3 cache to the nodes.

D.

Add L3 cache to the nodes.

Answers
Suggested answer: A

Explanation:

To ensure a Dell PowerScale cluster can handle many active client connections, the company should include a Leaf-Spine backend network in their system design.

Understanding Network Topologies:

Leaf-Spine Architecture:

A high-performance network topology designed to handle large amounts of east-west (node-to-node) traffic.

Consists of two network layers: leaf switches (access layer) and spine switches (aggregation layer).

Every leaf switch connects to every spine switch, providing multiple pathways and reducing bottlenecks.

Benefits for PowerScale Clusters:

Scalability:

Supports a large number of nodes and client connections without significant degradation in performance.

Low Latency:

Reduces hop count between any two endpoints, minimizing latency.

High Throughput:

Provides increased bandwidth to accommodate many active connections.

Redundancy:

Multiple pathways between nodes enhance fault tolerance.

Handling Many Active Client Connections:

Network Bandwidth:

A Leaf-Spine network ensures sufficient bandwidth is available for client connections and data movement.

Load Balancing:

Distributes client connections evenly across the network to prevent overloading any single path.

Reduced Contention:

Minimizes network congestion, leading to improved client experience.

Why Other Options Are Less Suitable:

Option B (Use the P100 node):

P100 nodes are accelerator nodes that enhance performance but do not specifically address handling many client connections.

Option C (Add maximum RAM in each node):

While increasing RAM can improve performance, it does not directly impact the cluster's ability to handle numerous client connections.

Option D (Add L3 cache to the nodes):

Adding L3 cache improves data retrieval speeds but does not significantly affect network capacity for client connections.

Dell PowerScale

Reference:

Dell EMC PowerScale Network Design Considerations:

Discusses network topologies and their impact on cluster performance.

Dell EMC PowerScale Network Design Considerations

Dell EMC PowerScale Best Practices Guide:

Recommends network architectures for optimal performance.

Dell EMC PowerScale Best Practices

Knowledge Base Articles:

Article ID 000123002: 'Implementing Leaf-Spine Architecture for PowerScale Clusters'

Article ID 000123003: 'Scaling Client Connections in Dell PowerScale Environments'

Which items are FRUs on a Dell EMC PowerScale Gen 6.5 node?

A.

SSD, power supply, and front-end NIC

A.

SSD, power supply, and front-end NIC

Answers
B.

DIMM, system battery, and front-end NIC

B.

DIMM, system battery, and front-end NIC

Answers
C.

DIMM, back-end NIC, and SSD

C.

DIMM, back-end NIC, and SSD

Answers
D.

DIMM, back-end NIC, and power supply

D.

DIMM, back-end NIC, and power supply

Answers
Suggested answer: A

Explanation:

Field Replaceable Units (FRUs) are components that can be replaced on-site by trained service personnel. In Dell EMC PowerScale Gen 6.5 nodes, certain components are designated as FRUs.

FRUs on Gen 6.5 Nodes:

SSD (Solid-State Drive):

Used for metadata acceleration and caching.

Can be replaced if faulty.

Power Supply:

Provides power to the node.

Hot-swappable and designed for field replacement.

Front-End NIC (Network Interface Card):

Handles client network connectivity.

Can be replaced in case of failure.

Why Other Options Are Incorrect:

DIMMs (Options B, C, D):

Memory modules are typically Customer Replaceable Units (CRUs) or require special handling.

Back-End NIC (Options C, D):

May not be designated as FRUs in Gen 6.5 nodes.

System Battery (Option B):

Usually considered a CRU.

Dell PowerScale

Reference:

Dell EMC PowerScale Hardware Replacement Guide:

Section on FRUs and CRUs:

Lists components classified as FRUs.

Provides procedures for replacing each FRU.

Best Practices:

Only trained personnel should replace FRUs.

Follow all safety guidelines and ESD precautions.

Which document was replaced by the PEQ?

A.

Site Preparation and Planning Guide

A.

Site Preparation and Planning Guide

Answers
B.

Web Administration Guide

B.

Web Administration Guide

Answers
C.

Supportability and Compatibility Guide

C.

Supportability and Compatibility Guide

Answers
D.

Configuration Guide

D.

Configuration Guide

Answers
Suggested answer: A

Explanation:

The Pre-Engagement Questionnaire (PEQ) is a tool used by Dell EMC to gather essential information about a customer's environment before deployment.

PEQ Replaces Site Preparation and Planning Guide:

Purpose of PEQ:

Collects detailed information on site readiness, network configuration, and customer requirements.

Ensures that all necessary preparations are made for a smooth implementation.

Why It Replaced the Site Preparation and Planning Guide:

Streamlines the process by consolidating information gathering into a single document.

Provides a more interactive and customer-focused approach.

Why Other Options Are Incorrect:

Web Administration Guide (Option B):

Provides instructions on administering the system via the web interface.

Supportability and Compatibility Guide (Option C):

Details supported hardware and software configurations.

Configuration Guide (Option D):

Offers guidance on configuring the system post-installation.

Dell PowerScale

Reference:

Dell EMC PowerScale Implementation Resources:

PEQ Documentation:

Describes the purpose and usage of the PEQ.

Highlights how it replaces the previous Site Preparation and Planning Guide.

Best Practices:

Complete the PEQ thoroughly and accurately.

Use the PEQ to facilitate communication between the implementation team and the customer.

Which Dell EMC PowerScale Gen 6 components are considered CRUs?

A.

SSD, power supply, fan, and bezel

A.

SSD, power supply, fan, and bezel

Answers
B.

Back-end switch, power supply, disk drive, and bezel

B.

Back-end switch, power supply, disk drive, and bezel

Answers
C.

SSD, power supply, disk drive, and bezel

C.

SSD, power supply, disk drive, and bezel

Answers
D.

SSD, memory card, disk drive, and bezel

D.

SSD, memory card, disk drive, and bezel

Answers
Suggested answer: C

Explanation:

In Dell EMC PowerScale Gen 6 systems, components are categorized as either Customer Replaceable Units (CRUs) or Field Replaceable Units (FRUs). CRUs are parts that customers are authorized to replace themselves without the need for a Dell EMC service technician. Understanding which components are CRUs is essential for efficient maintenance and minimal downtime.

CRUs in PowerScale Gen 6:

SSD (Solid-State Drive) and Disk Drive:

Both SSDs and HDDs are considered CRUs.

They can be hot-swapped without powering down the node.

Customers can replace failed drives to restore full functionality.

Power Supply:

Power supplies are hot-swappable and designated as CRUs.

Nodes typically have redundant power supplies; replacing one does not require shutting down the node.

Bezel:

The front bezel is considered a CRU.

It can be removed and replaced without tools.

Serves both aesthetic and airflow management purposes.

Why Option C is Correct:

SSD: As a storage component, the SSD is a CRU.

Power Supply: Designated as a CRU for quick replacement.

Disk Drive: Refers to HDDs, also CRUs.

Bezel: Easily removable by the customer.

Why Other Options are Incorrect:

Option A: Includes fan, which is not typically a CRU in Gen 6 nodes; fans are usually considered FRUs due to the complexity of replacement and potential risks.

Option B: Lists back-end switch, which is a complex component requiring a service technician (FRU).

Option D: Includes memory card (DIMM), which is generally not a CRU because replacing memory modules requires technical expertise and poses risks if not done correctly.

Dell PowerScale

Reference:

Dell EMC PowerScale Hardware Replacement Guide:

Chapter on Customer Replaceable Units (CRUs):

Lists the components that customers can replace.

SSDs, HDDs, power supplies, and bezels are specified as CRUs.

Safety Instructions:

Provides guidelines on how to safely replace CRUs.

Emphasizes the use of ESD (Electrostatic Discharge) precautions.

Dell EMC PowerScale OneFS Administration Guide:

Disk Management Section:

Explains how to handle drive replacements.

Details the hot-swapping procedure for drives.

Best Practices:

Before Replacing a CRU:

Verify the component has indeed failed.

Ensure you have the correct replacement part.

During Replacement:

Follow proper shutdown procedures if required (though CRUs are typically hot-swappable).

Use appropriate ESD protection.

After Replacement:

Confirm that the system recognizes the new component.

Monitor the system for any errors or warnings.

A cluster consists of H400 nodes. A200 nodes, and tour Gen6 bays available tor expansion. An engineer plans to open bays.

What is the result?

A.

A300 nodes can be added and become members of the A200 node pool through the compatibility mode.

A.

A300 nodes can be added and become members of the A200 node pool through the compatibility mode.

Answers
B.

A300 nodes cannot be installed in this cluster.

B.

A300 nodes cannot be installed in this cluster.

Answers
C.

A300 nodes can be added, and a new A300 node pool is created.

C.

A300 nodes can be added, and a new A300 node pool is created.

Answers
D.

A300 nodes can be added and become members of the H400 node pool through the compatibility mode.

D.

A300 nodes can be added and become members of the H400 node pool through the compatibility mode.

Answers
Suggested answer: A

Explanation:

When an engineer plans to add A300 nodes to an existing cluster consisting of H400 and A200 nodes, the A300 nodes can be added and become members of the A200 node pool through compatibility mode.

Understanding Node Pools and Compatibility Mode:

Node Pools:

Groups of nodes with similar hardware and performance characteristics.

Nodes in the same pool can share data and balance workloads effectively.

Compatibility Mode:

Allows newer nodes to join an existing node pool with older nodes.

Ensures compatibility by adjusting performance features to match the existing pool.

Adding A300 Nodes to the A200 Node Pool:

A200 and A300 Nodes:

Both are archive nodes designed for high-capacity storage.

A300 nodes are the next generation with updated hardware.

Using Compatibility Mode:

A300 nodes can operate in compatibility mode to align with the A200's capabilities.

Allows seamless integration without disrupting existing operations.

Process and Considerations:

Cluster Expansion:

The engineer can add the A300 nodes to the cluster and configure them to join the A200 node pool.

Performance Adjustments:

Compatibility mode may limit some of the newer nodes' advanced features to match the older nodes.

Benefits:

Extends the cluster's capacity using newer hardware.

Preserves investment in existing infrastructure.

Why Other Options Are Less Suitable:

Option B (A300 nodes cannot be installed in this cluster):

Incorrect; OneFS allows mixing different node types within the same cluster.

Option C (A300 nodes can be added, and a new A300 node pool is created):

While possible, the question specifies that the engineer plans to open bays, implying expansion within the existing node pool.

Option D (A300 nodes become members of the H400 node pool):

H400 nodes are hybrid nodes; it's not typical to mix archive nodes (A-series) with hybrid nodes (H-series) in the same node pool.

Dell PowerScale

Reference:

Dell EMC PowerScale OneFS Administration Guide:

Details on node pools, compatibility mode, and cluster expansion.

Dell EMC PowerScale OneFS Administration Guide

Dell EMC PowerScale OneFS Best Practices Guide:

Provides guidelines for adding new nodes to existing clusters.

Dell EMC PowerScale OneFS Best Practices

Knowledge Base Articles:

Article ID 000123004: 'Adding A300 Nodes to an Existing Cluster with A200 Nodes'

Article ID 000123005: 'Understanding Compatibility Mode in Dell PowerScale Clusters'

What security mechanism is used in the OneFS API to encrypt communications?

A.

SED

A.

SED

Answers
B.

RBAC

B.

RBAC

Answers
C.

HTTPS

C.

HTTPS

Answers
D.

OpenSSH

D.

OpenSSH

Answers
Suggested answer: C

Explanation:

The OneFS API uses HTTPS (HyperText Transfer Protocol Secure) to encrypt communications, ensuring secure data transfer between clients and the PowerScale cluster.

OneFS API and Security:

OneFS API:

Provides a RESTful interface for programmatically managing and interacting with the PowerScale cluster.

Security Importance:

Protects sensitive data and configuration information transmitted via the API.

Use of HTTPS:

Encryption:

HTTPS uses TLS (Transport Layer Security) to encrypt data in transit.

Prevents eavesdropping and man-in-the-middle attacks.

Authentication:

Supports certificate-based authentication to verify the identity of the server.

Standard Protocol:

Widely accepted and supported for secure web communications.

Why Other Options Are Less Suitable:

Option A (SED):

Self-Encrypting Drives (SEDs) encrypt data at rest, not communications.

Option B (RBAC):

Role-Based Access Control (RBAC) manages user permissions and authorization, not encryption.

Option D (OpenSSH):

OpenSSH provides secure shell access, not used for the OneFS API communications.

Implementing HTTPS with OneFS API:

Default Behavior:

OneFS API endpoints are accessed via HTTPS by default on port 8080 or 8080.

Certificate Management:

Administrators can install custom SSL certificates to ensure secure connections.

API Calls:

Applications interacting with the OneFS API must support HTTPS requests.

Dell PowerScale

Reference:

Dell EMC PowerScale OneFS API Reference Guide:

Details on API usage and security considerations.

Dell EMC PowerScale OneFS API Reference Guide

Dell EMC PowerScale OneFS Security Configuration Guide:

Provides information on configuring HTTPS and managing certificates.

Dell EMC PowerScale OneFS Security Guide

Knowledge Base Articles:

Article ID 000123006: 'Securing OneFS API Communications with HTTPS'

Article ID 000123007: 'Configuring SSL Certificates for OneFS API Access'

A platform engineer cables, powers up, and creates a new cluster of F600 nodes. While performing verification checks, no clients can access the cluster and the engineer cannot ping the nodes.

What is the probable issue?

A.

Manual reboot was not done following the cluster join.

A.

Manual reboot was not done following the cluster join.

Answers
B.

Network was connected to the F600 rNDC ports.

B.

Network was connected to the F600 rNDC ports.

Answers
C.

Nodes were connected to the management ports.

C.

Nodes were connected to the management ports.

Answers
D.

Internal network was cabled improperly.

D.

Internal network was cabled improperly.

Answers
Suggested answer: C

Explanation:

When setting up a new Dell EMC PowerScale F600 cluster, proper cabling is crucial for network connectivity and cluster functionality. The F600 nodes have multiple network ports:

Front-End (Client) Ports: For client network access.

Back-End (Internal) Ports: For node-to-node communication within the cluster.

Management Ports: Dedicated for node management and should not be used for client traffic.

Probable Issue:

Incorrect Cabling to Management Ports: If the nodes are connected to the management ports instead of the front-end network ports, clients will not be able to access the cluster, and the nodes will not respond to pings on the client network.

Key Points:

Management Ports Usage: Reserved for administrative tasks like cluster management and should not carry client data.

Impact of Misconfiguration: Connecting client networks to management ports leads to inaccessible services for clients.

Dell PowerScale

Reference:

Dell EMC PowerScale Networking Configuration Guide:

Chapter on Network Connectivity emphasizes the correct usage of network ports.

Illustrations showing proper cabling of front-end and management ports.

Installation Best Practices:

Verify all network connections according to the hardware installation guide.

Use the correct network ports for client and management traffic.

A platform engineer is building a new Dell EMC PowerScale cluster. The configuration wizard prompts to configure int-a.

What is a consideration when configuring int-a?

A.

Must be on the same subnet as int-b.

A.

Must be on the same subnet as int-b.

Answers
B.

Must use the same subnet as groupnet0, subnet0.

B.

Must use the same subnet as groupnet0, subnet0.

Answers
C.

Must be on a separate subnet from int-b.

C.

Must be on a separate subnet from int-b.

Answers
D.

Must use the same subnet as node 1, ext-1.

D.

Must use the same subnet as node 1, ext-1.

Answers
Suggested answer: C

Explanation:

In a Dell EMC PowerScale cluster, int-a and int-b are internal network interfaces used for back-end communication between nodes. Proper configuration of these interfaces is essential for cluster performance and redundancy.

Considerations:

Separate Subnets for int-a and int-b:

Assigning int-a and int-b to separate subnets enhances network redundancy.

If one subnet experiences issues, the other can continue to handle internal traffic.

Not on the Same Subnet:

Placing both interfaces on the same subnet can create a single point of failure.

It may also cause network conflicts and degrade performance.

Key Points:

Network Isolation: Separating int-a and int-b ensures that internal communications are robust and fault-tolerant.

Performance Optimization: This configuration allows for load balancing of internal traffic.

Dell PowerScale

Reference:

Dell EMC PowerScale OneFS Network Configuration Guide:

Internal Network Configuration section recommends using separate subnets for int-a and int-b.

Explains the benefits of network redundancy and performance.

Best Practices:

Plan IP addressing schemes that allocate different subnets for internal interfaces.

Document network configurations for troubleshooting and maintenance.

Total 101 questions