Six Sigma ICBB Practice Test - Questions Answers, Page 34
List of questions
Identify the Six Sigma tools and methodologies used to achieve the standard breakdown process.
A.
Survey
B.
Decomposition and integration
C.
Benchmarking
D.
Market research
Identify the process by which we can eliminate non value added activities?
A.
Lean manufacturing process
B.
Prioritization metrics process
C.
Process capability indices
D.
Process performance metrics
Which of the following is not a time estimates for PERT?
A.
Pessimistic time
B.
Most likely time
C.
Optimistic time
D.
Waiting time
All of the following are the constraints of DFX EXCEPT:
A.
Cost
B.
Branding
C.
Manufacturability
D.
Maintainability
Attribute control charts are different from most of the variables control charts. It is because they do not have _________________.
A.
UCL
B.
LCL
C.
CL
D.
Two graphs
Which of the following process flow metrics is an essential requirement to calculate 'productivity'?
A.
Effort-related metrics
B.
Defect-related metrics
C.
Cost-variation metrics
D.
Schedule slippage metrics
Which one of the following functions does market research data mainly deal with?
A.
Collecting data systematically and analysis of a particular target market
B.
Helping to solve the conflict between the customers and the sellers
C.
Providing training to different organizations
D.
Reducing the risk of the purchaser in the market
What is calibration system?
A.
Process of determining and adjusting an instrument's accuracy to make sure it is within the manufacturer's specification
B.
Process of checking or adjusting the products accuracy
C.
Process of allocating the goods
D.
Process of determining the product's prices
What type of data is required to measure rainfall (in mm)?
A.
Binary
B.
Count
C.
Continuous
D.
Ordinal
Question