Six Sigma ICBB Practice Test - Questions Answers, Page 18
List of questions
Handling of warranty returns, process improvement team meetings and rework to meet customer expectations are all examples of business costs that are classified as ________________ .
At the very initiation of a project a Belt must develop a concise _______________ that states at a high level the area of concern and why it is important this issue be improved.
The English words used for the 5S's are Sorting, Straightening, _____________ , __________ and Sustaining. (Note: There are 2 correct answers).
An example of the waste of mismanaged Inventory is __________.
In a Fishbone Diagram the 6M's stand for Methods, ____________, Machine, Man, Mother Nature and Materials.
The most appropriate type of FMEA for a product before going into manufacturing is a ___________ FMEA
Which one of the listed tools is frequently used to help drill down to possible causes once a Fishbone Diagram is constructed?
One of the primary deliverables from performing a SIPOC is to begin to understand which inputs have the greatest affect on the ______________ outputs.
Two of the key deliverables for the Measure Phase are a robust description of the process and its flow and an assessment of the Management System.
A valuable tool to use during the Measure Phase to show material and information flow throughout an entire process is the ______________ .
Question