Question 171

Handling of warranty returns, process improvement team meetings and rework to meet customer expectations are all examples of business costs that are classified as ________________ .
Question 172

At the very initiation of a project a Belt must develop a concise _______________ that states at a high level the area of concern and why it is important this issue be improved.
Question 173

The English words used for the 5S's are Sorting, Straightening, _____________ , __________ and Sustaining. (Note: There are 2 correct answers).
Question 174

An example of the waste of mismanaged Inventory is __________.
Question 175

In a Fishbone Diagram the 6M's stand for Methods, ____________, Machine, Man, Mother Nature and Materials.
Question 176

The most appropriate type of FMEA for a product before going into manufacturing is a ___________ FMEA
Question 177

Which one of the listed tools is frequently used to help drill down to possible causes once a Fishbone Diagram is constructed?
Question 178

One of the primary deliverables from performing a SIPOC is to begin to understand which inputs have the greatest affect on the ______________ outputs.
Question 179

Two of the key deliverables for the Measure Phase are a robust description of the process and its flow and an assessment of the Management System.
Question 180

A valuable tool to use during the Measure Phase to show material and information flow throughout an entire process is the ______________ .
Question