Which one of these tools is frequently used to help drill down to possible causes once a Fishbone Diagram is constructed?

A.
3 When Analysis
A.
3 When Analysis
Answers
B.
5 Why Analysis
B.
5 Why Analysis
Answers
C.
Ishikawa Diagram
C.
Ishikawa Diagram
Answers
D.
Skeleton Diagnostic
D.
Skeleton Diagnostic
Answers
Suggested answer: B

Two of the key deliverables for the Measure Phase are a robust description of the process and its flow and an assessment of the Measurement System.

A.
True
A.
True
Answers
B.
False
B.
False
Answers
Suggested answer: A

A valuable tool to use during the Measure Phase to show material and information flow throughout an entire process is the ______________ .

A.
Value Stream Map
A.
Value Stream Map
Answers
B.
FMEA
B.
FMEA
Answers
C.
Pareto Chart
C.
Pareto Chart
Answers
D.
Standard Operating Procedure
D.
Standard Operating Procedure
Answers
Suggested answer: A

One of the primary deliverables from performing a SIPOC is to begin to understand which outputs have the greatest affect on the customer most valued inputs.

A.
True
A.
True
Answers
B.
False
B.
False
Answers
Suggested answer: B

From this list select the items that define what an X-Y Diagram is. (Note: There are 4 correct answers).

A.
Created for every project
A.
Created for every project
Answers
B.
Based on team's collective opinions
B.
Based on team's collective opinions
Answers
C.
Updated whenever a parameter is changed
C.
Updated whenever a parameter is changed
Answers
D.
Used to show each step in a process
D.
Used to show each step in a process
Answers
E.
A living document throughout project lifecycle
E.
A living document throughout project lifecycle
Answers
Suggested answer: A, B, C, E

The most appropriate type of FMEA for a product before going into manufacturing is a ___________ FMEA

A.
Design
A.
Design
Answers
B.
Consumer
B.
Consumer
Answers
C.
Survey
C.
Survey
Answers
D.
Test Process
D.
Test Process
Answers
Suggested answer: A

Early in a project a Belt will want to begin to identify and evaluate risk factors for the subject process and will therefore begin building a(n) ________.

A.
FMEA
A.
FMEA
Answers
B.
SIPOC
B.
SIPOC
Answers
C.
X-Y Diagram
C.
X-Y Diagram
Answers
D.
Team Charter
D.
Team Charter
Answers
Suggested answer: A

Of the various types of data shown below which is NOT representative of Variable Data.

A.
Length of a table
A.
Length of a table
Answers
B.
Liters of solution added to a formula
B.
Liters of solution added to a formula
Answers
C.
Number of employees wearing a uniform
C.
Number of employees wearing a uniform
Answers
D.
Miles per hour of a vehicle
D.
Miles per hour of a vehicle
Answers
Suggested answer: C

The two types of data that can be used in Statistical Analysis are Attribute and Variable.

A.
True
A.
True
Answers
B.
False
B.
False
Answers
Suggested answer: A

All the data points that represent the total set of information of interest is called the ________________ .

A.
Population
A.
Population
Answers
B.
Sample
B.
Sample
Answers
C.
Frame
C.
Frame
Answers
D.
Spread
D.
Spread
Answers
Suggested answer: A
Total 369 questions