Question 41

Report Export Collapse

Which of these graphs demonstrates conditions which would be sufficient to enable OCAP for the process?

Xbar Chart
Xbar Chart
Time Series Chart
Time Series Chart
Neither
Neither
Both
Both
Suggested answer: A
asked 23/09/2024
Casie Clements
40 questions

Question 42

Report Export Collapse

Control Charts were developed by Dr. Shewhart to track data over time. To detect Special Cause variation the Control Charts use which of these?

Data shift analysis
Data shift analysis
Outlier analysis methods
Outlier analysis methods
Center Line and Control Limits
Center Line and Control Limits
None of the above
None of the above
Suggested answer: C
asked 23/09/2024
Anthony Zaborski
54 questions

Question 43

Report Export Collapse

Common and ______________ Cause Variation are the focus of Statistical Process Control.

Uncommon
Uncommon
Ordinary
Ordinary
Special
Special
Selective
Selective
Suggested answer: C
asked 23/09/2024
Sergiu Anton
39 questions

Question 44

Report Export Collapse

Special Cause Variation falls into which two categories?

Natural & Unnatural
Natural & Unnatural
Short Term & Long Term
Short Term & Long Term
Assignable & Pattern
Assignable & Pattern
Attribute & Discreet
Attribute & Discreet
Suggested answer: C
asked 23/09/2024
Leonelo Sanchez
34 questions

Question 45

Report Export Collapse

Range Charts are the technique used to determine if Special Causes are occurring within the subgroups of the ______________.

Histograms
Histograms
SPC Charts
SPC Charts
NP Charts
NP Charts
Pareto Charts
Pareto Charts
Suggested answer: B
asked 23/09/2024
MANIVANNAN POOPALASINGHAM
37 questions

Question 46

Report Export Collapse

If the production is for higher volume and monitoring and the Mean and variability is to be monitored for four machines producing product and the characteristic to be monitored is Variable Data, which SPC Chart is best to be selected?

Xbar-R Chart
Xbar-R Chart
Individual-MR Chart
Individual-MR Chart
NP Chart
NP Chart
CUSUM Chart
CUSUM Chart
Suggested answer: A
asked 23/09/2024
Sana Mehak
48 questions

Question 47

Report Export Collapse

When a Belt Poka-Yoke's a defect out of the process entirely then she should track the activity with a robust SPC system on the characteristic of interest in the defect as an early warning system.

True
True
False
False
Suggested answer: B
asked 23/09/2024
IGNACIO CHICO TORRES
42 questions

Question 48

Report Export Collapse

Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critical metrics move out of spec.

Response Plan
Response Plan
Call List
Call List
Chain-of-Command
Chain-of-Command
Defect Analysis Plan
Defect Analysis Plan
Suggested answer: A
asked 23/09/2024
Mike Schatens
37 questions

Question 49

Report Export Collapse

The Control Limits width varies if the sample size varies for which type of chart?

P Charts
P Charts
NP Charts
NP Charts
Xbar-R Charts
Xbar-R Charts
Time Series Charts
Time Series Charts
Suggested answer: A
asked 23/09/2024
Jon Jones
40 questions

Question 50

Report Export Collapse

Which of these elements are not included in Implementation plans?

Work breakdown structure
Work breakdown structure
Risk management plans
Risk management plans
Cost/Benefit ratios
Cost/Benefit ratios
Planned audits of work completion
Planned audits of work completion
Suggested answer: C
asked 23/09/2024
Nidal Allamadani
53 questions
Total 369 questions