ExamGecko
Home / Six Sigma / ICBB / List of questions
Ask Question

Six Sigma ICBB Practice Test - Questions Answers, Page 7

List of questions

Question 61

Report Export Collapse

Which Experimental Design typically is most associated with the fewest number of input variables or factors in the design?

Fractional Factorial design
Fractional Factorial design
Full Factorial design
Full Factorial design
Simple Linear Regression
Simple Linear Regression
Response Surface Design
Response Surface Design
Suggested answer: D
asked 23/09/2024
Godavari, Rakesh
49 questions

Question 62

Report Export Collapse

The method of Steepest Ascent guides you toward a target inside the original inference space.

True
True
False
False
Suggested answer: B
asked 23/09/2024
Andrew Chan
40 questions

Question 63

Report Export Collapse

Situations where standardized work needs to be incorporated include all of these except _____________________.

Machines continually operating to reduce the labor cost per piece
Machines continually operating to reduce the labor cost per piece
Lack of a system to assure proper inventory levels at repair stations
Lack of a system to assure proper inventory levels at repair stations
Changeover instructions incomplete
Changeover instructions incomplete
Process flow for the same product assembly taking various cycle time for completion
Process flow for the same product assembly taking various cycle time for completion
Suggested answer: A
asked 23/09/2024
nagalingam mk
44 questions

Question 64

Report Export Collapse

The Lean toolbox includes all of these items except ________________.

Mistake Proofing
Mistake Proofing
Visual Factory
Visual Factory
Design of Experiments
Design of Experiments
Inventory Management
Inventory Management
Suggested answer: C
asked 23/09/2024
RAOUL AMODIO
52 questions

Question 65

Report Export Collapse

Questions that can be best answered by a Visual Factory include all of these except

_____________________.

Are downtime issues easily noted?
Are downtime issues easily noted?
Can extra inventory be seen easily?
Can extra inventory be seen easily?
Are unneeded tools or supplies easily noted?
Are unneeded tools or supplies easily noted?
Are setups optimized for lower scrap levels?
Are setups optimized for lower scrap levels?
Suggested answer: D
asked 23/09/2024
Pachara Suwannasit
37 questions

Question 66

Report Export Collapse

If a Six Sigma project was to reduce repair station inventory and the team found the inventory was creeping up over time which Lean tools should be considered in the Control Phase to reestablish and sustain the project success?

Review the Visual Factory to assure inventory in excess of desired visible
Review the Visual Factory to assure inventory in excess of desired visible
Improve the lighting to assure adequate visibility
Improve the lighting to assure adequate visibility
Analyze data from supplier deliveries
Analyze data from supplier deliveries
Reword the standardized work instructions to use active verbs and not passive phrases
Reword the standardized work instructions to use active verbs and not passive phrases
Suggested answer: A
asked 23/09/2024
Victor Gouveia Pennella
47 questions

Question 67

Report Export Collapse

When a Belt implements an improvement that is automated thus requiring no particular understanding for use he has applied which Lean tool?

Mistake Proofing
Mistake Proofing
Kaizen Event
Kaizen Event
5S
5S
None
None
Suggested answer: A
asked 23/09/2024
SIDDIQI TARMIM
43 questions

Question 68

Report Export Collapse

Kaizens or Kaikakus and Six Sigma projects are intended to create incremental process improvements versus breakthrough, significant improvements.

True
True
False
False
Suggested answer: B
asked 23/09/2024
Bianca Duizer
54 questions

Question 69

Report Export Collapse

Which of these items contribute to what is necessary for successful Kaizen events?

Analysis tools
Analysis tools
Management support
Management support
Operator support
Operator support
All of these answers are correct
All of these answers are correct
Suggested answer: D
asked 23/09/2024
Darren Bilmen
39 questions

Question 70

Report Export Collapse

Kanban establishes a means of monitoring production, conveyance and delivery information such that efficient flow is established. The method used by Kanban is to require a _________ before anything moves.

Sign-off
Sign-off
Signal
Signal
Bell to ring
Bell to ring
Work order
Work order
Suggested answer: B
asked 23/09/2024
Kevin Margan
50 questions
Total 369 questions
Go to page: of 37

Related questions