Avaya 3309 Practice Test - Questions Answers, Page 8
List of questions
Which statement best describes the concept of Proactive Outreach Manager (POM) campaigns?
What acts as the control center for all H.323 VoIP interactions in the Avaya Aura® Experience Portal (AAEP) system?
To store and retrieve data, which account does the Experience Portal Manager (EPM) server use to log into the Avaya Aura® Experience Portal (AAEP) database?
The Agent script editor allows the use of GUI elements such as text boxes and buttons within the agent script.
In which situation are such elements used?
In addition to the standard date and time filters, the ICR CCA Session Detail Report offers optional filters for what information? (Choose two.)
On a Proactive Outreach Manager (POM) 3.0 system, 100 agents are available for campaigns. The total number of agents required for all running campaigns is 120.
When running a campaign requiring 30 agents, what information is needed to determine the number of agents to be assigned? (Choose two.)
A Postgres database is being used to support Proactive Outreach Manager (POM) 3.0.
Why does the pg_hba.conf file need to be changed?
The Licensing Allocations page for a single server, non-zonal Avaya Aura® Experience Portal (AAEP) system shows 50 licensed H.323 ports.
Which two statements about the Allocated, Configured and Licensed columns of the licensing allocations page are true? (Choose two.)
In Global configuration the retry interval for nailing can be defined.
Which statement describes nailing?
Which two statements about the priority of a Proactive Outreach Manager (POM) campaign are true?
(Choose two.) A. Available priorities are 1-8.
Question